TESTING SERVICES
- D.C. Hipot
- D.C. Leak Voltage
- RTD Insulation Resistance
- Tube to Tube Resistance
- RTD Resistance Measurements
- Transposition Voltage Comparison Test
- Vent Tube Pressure Drop Test, Flow Test
- Parallel Ring Assembly Air Flow Test
- Main & Neutral Bushing Air Flow Test
- Air Gap Baffle Wedge Assembly Tightness
- Check Torque of Through & Building Blocks
- Complete Visual Inspection of Stator Components
- Wedge Tightness Test (Rotor to be removed)
- Dielectric Absorption
- Insulation Resistance of Each Phase
- Thermocouple Continuity Test
- Tube to Copper Resistance
- Phase Resistance Measurements
- Doble Test
- Loop Test
- NDE Test
- Inspect for Abnormal Generator Conditions
- Set up Equipment and Calibrate
- Install Excitation Cable in Generator
- Connect with 220 VAC Source
- Perform Electromagnetic Inspection of Stator
- Observe Inspection Findings as Gathered, Verifying Through Repeat Inspection
- Test Step Iron
- Verify Calibration at Conclusion of Inspection
- Review Inspection Findings with Customer
- Impedance Test
- Insulation Resistance of Windings
- Rotor Winding Resistance Measurements
- Air Test Radial Lead Assembly
- Complete Visual Inspection of Generator Rotor
- Pole Balance
- RSO Test

- RTD Resistance Test
- RTD Insulation Resistance
- Thermocouple Continuity
- Fuse Testing
- Diode Current Leakage
- Capacitor Change & Discharge
- Diode Wheel Insulation
- Insulated Ground Detection Ring Insulation
- Diode/Heat Sink Contact Resistance
- Diode Forward & Reverse Resistance
- Voltage Divider Resistance
- Radial Main Leads & Coupling Leads
- Winding Resistance
- Visual Inspection
- Insulation Resistance
- A.C. Impedance (Pole Balance)
- Insulation Resistance
- Visual Inspection
- Winding Resistance
- Field Current Limiting Resistance
- Winding Resistance
- Visual Inspection
- Insulation Resistance
- Bearing & Pedestal Insulation Resistance
- Rotor Ground Detection Ring